Search for more Public Notices in your area
Planning

LONDON BOROUGH OF HARINGEY TOWN AND COUNTRY PLANNING ACT 1990 THE COUNCIL OF THE LONDON BOROUGH OF HARINGEY

Notice ID: WAT1640781

Notice effective from
4th March 2020 to 3rd April 2020

LONDON BOROUGH OF HARINGEY TOWN AND COUNTRY PLANNING ACT 1990
THE COUNCIL OF THE LONDON BOROUGH OF HARINGEY ("the Council") hereby gives you notice that it has made an order under Section 247 of the above Act entitled "the London Borough of Haringey (Stopping up of Highways) Tottenham Hale SDP Sites Order 2020" to authorise the stopping up of the following areas of public highway which are shown hatched black on the plan attached to the draft order:
Area 1 - part of the highway running from Monument Way, London N17 to the footway on Fairbanks Road, London N17 (grid reference E:534124 N:189623) with a maximum length of 38 metres and a maximum width of 22 metres and an area of 468 square metres
Area 2 - part of the highway on Watermead Way, London N17 along the northern boundary near the junction with Ashley Road, London N17 (grid reference E:534405 N:189577) with a maximum length of 3 metres and a maximum width of 1.2 metres and an area of 1.81 square metres
Area 3 - part of the highway on Watermead Way, London N17 along the northern boundary near the junction with Ashley Road, London N17 (grid reference E:534432 N: 189591) with a maximum length of 4 metres and a maximum width of 0.6 metres and an area of 0.85 square metres
Area 4 - part of the highway on Station Road, London N17 at the junction with the Hale, London N17 (grid reference E:534280 N:189529) with a maximum length of 22 metres and a maximum width of 15 metres and an area of 193.4 square metres
Area 5 - part of the highway running from Ferry Lane, London N17 to Watermead Way, London N17 (grid reference E:534393 N:189480) with a maximum length of 80 metres and a maximum width of 37 metres and an area of 1,562.2 square metres
THE ORDER IS MADE to enable the development described in Schedule 1 to be carried out in accordance with the planning permission granted under Part III of the Act to TH DM Limited by the Council on 27 March 2019 with planning reference HGY/2018/2223.
THE ORDER SHALL COME INTO FORCE WITH IMMEDIATE EFFECT SAVE THAT:
i) The stopping-up of Area 1 shall only come into force on the date on which the Council issues a completion certificate or a completion certificate is deemed to have been issued by the Council pursuant to the highways agreement described in Schedule 2 certifying that the works to realign the existing pedestrian and cycle route between Monument Way and Fairbanks Road N17 have been completed in accordance with the highways agreement; and
ii) The stopping-up of Area 4 shall only come into force on the date on which the Council issues a completion certificate or a completion certificate is deemed to have been issued by the Council pursuant to the highways agreement described in Schedule 2 certifying that the works to realign Station Road N17 have been completed in accordance with the highways agreement.
COPIES OF THE ORDER AND THE RELEVANT PLANS MAY BE INSPECTED FREE OF CHARGE BY WAY OF APPOINTMENT DURING NORMAL OPENING HOURS at Legal Services, Level 7, Alexandra House, Station Road, Wood Green, London N22 7TR (quoting reference LEG/PP/RXW/60979) between the hours of 9 am and 5 pm Monday to Friday (excluding bank holidays and public holidays) from 4th March 2020.
ANY PERSON AGGRIEVED BY THE ORDER and wishing to question its validity, or any provision contained in the order, on the ground that it is not within the powers of the Act or that any procedural requirement of the Act or any regulation made under the Act has not been complied with in relation to the making of the order may, within 6 weeks following 4th March 2020 apply to the High Court for the suspension or quashing of the order or of any provision contained in the order.
Bernie Ryan
Assistant Director of Corporate Governance
SCHEDULE 1

Demolition works and clearance of existing site to provide a mixed use development comprising 6 buildings up to 38 storeys in height, which together with pavilion and basement accommodation will provide up to 104,053m2 of floorspace (GIA), comprising residential (Use Class C3) (up to 1,036 units), retail (Use Class A1-A4), health care (Use Class D1), office (Use Class B1), leisure (Use Class D2) parking and servicing areas, hard and soft landscaping (including the provision of a new public square), highway works, creation of new vehicular accesses and the realignment of Station Road, decentralised energy network works and other associated works.
SCHEDULE 2
The highways agreement dated 16 January 2019 entered into by the Council, TH DM Limited, TH Ferry Island Nominee 1 Limited and TH Ferry Island Nominee 2 Limited and TH Ferry Island Limited Partnership relating to land known as Tottenham Hale Bus Station and Strategic Development Sites Welbourne, North Island, Ferry Island, Ashley Road East, Ashley Road West, Station Road, London N17 pursuant to sections 38 and 278 of the Highways Act 1980 (and all other enabling provisions).

Attachments

WAT1640781.pdf Download

London Borough of Haringey

Comments


or Register to leave a comment and/or receive comment alerts.

Related notices